SERVICES INDUSTRY RESIDENTIAL HOTELS COMMERCIAL DATA CENTRES TELECOMMUNICATIONS SELF GENERATION HOSPITALS HISTORICAL BUILDINGS CONTESTS

 

Regione Lombardia
Cultural Centre Turin
SKY Village
30A1 Building
Trento Court House
Bodio Centre
Maciachini Centre
Danielli's skyscraper
Milan Tech Institute
H3G Edison
H3G Da Vinci
H3G Cristoforo Colombo
RAS C.so Italia
RAS M. Gioia
RAS V.le Monza
RAS Velasca Tower
The "Galbanino"
Telecom Boscaiola
Telecom Skyscraper GE
Telecom Te Brunetti
Telecom Guidoni
Generali RE Group
BNL Roma
Sport Centre Turin

 

BODIO CENTRE
Milan

Commissioned by: AUKETT + GARRETTI

Developer + P.M.: Europa Risorse

Architectural Design: Aukett+Garretti, Arch. Kanah

Detail Design and Site Supervision for the refurbishment and realization of the new Management Center in Milan, viale Bodio, ex-Alcatel area.

The goal of the work has been the search for technical solution allowing extreme speed and efficiency in the realisation and a control on the cost of realisation and management. The design activity started in fall 2001, on June 30th 2002 the first building (6.000sq.m) was delivered to the final user "MARSH", on December 30th 2002 other two buildings (25.000sq.m total) was delivered to "UNICREDITO"

The thermal-vector fluids production stations are POLYVALENT, heat-pump reversible; the COP (C.O.P .= Coefficient of Performance), defined as the relationship between the system outgoing thermal power (cooling power + heating power = outgoing thermal power) and the system incoming power (electrical power = incoming power), given the particular configuration of the thermo-frigo station and the fed-by plants, it's always at the best level achievable in relation to the thermo-hygrometric conditions and the use of the " building/plants system"

In the part of the year when there is the production of cold energy (summer and mid-season period) there is "no energetic cost" in the production of hot energy, and vice-versa.

DESIGN DATA:
60.000 sq.m: 3 existing buildings (phase 1) - 5 new buildings (phase 2)
7.500 frigorific kW
9.000 electrical kW

WORKS AMOUNT:  24.000.000 € (M&E Plants)

PERIOD:                 From June 2001 to September 2003 (Design) - Site Supervision in progress