|
|
|
Turin
Municipality Commissioned by: Turin Municipality – the Culture and Museum Authority Architectural Design: arch. Mario Bellini Design winner of the public competition called by the Culture and Museum Authority of Turin Municipality for the realization of a New Cultural Center. The goal of this realisation is to create a new strongly-attracting cultural facility inside the city of Turin with a 40.000sq.m library, two prose theatres (1.200 and 400 seats), a 500 seats outdoor theatre, offices, public service areas, restaurants, management services, parking lots, green areas. In terms of energy saving the design consists in the use of underground water-table (max extraction depth 35mt - not usable for potable purpose) for HVAC use in combination with a chilled-beams system in the library areas. During the hot season the underground water-table will be used for:
The use of chilled-beam system in the library has further aspects as:
Further aspect of the use of underground water-table is:
Design
data: works amount: 63.000.000 € - estimated (M&E Plants) PERIOD: From January 2002 to July 2006 |
|