|
|
H3G Commissioned by: STARCHING srl Architecture and structures: STARCHING srl Detail design and site supervision of M&E plants for the refurbishment of the office building and Contact Centre in Trezzano s/N, via Edison. 4-pipes
ventilated cooled beams climate system. UTP
cat. 6 LAN cabling. DESIGN
DATA: WORKS AMOUNT: 2.132.000,00 € (M&E plants) PERIOD: From June 2001 to January 2005 |
|