Commissioned by: Savoia Properties S.r.l.

Architectural Design: Arch. GianMaria Beretta, Arch. Roberto Beretta

Structures: Redesco S.r.l.

Detail design and site supervision for the refurbishment of the former Unicredito Head Office and its conversion to highly prestigious residential complex.

The refurbishment concerns an entire block of buildings in the centre of Milan and represents a unique intervention in the city involving:

  •   Demolition of all the buildings built in the ‘60s and of the multilevel parking facing Viale Beatrice d’Este

  •   New buildings aesthetically lined up with the late 19th century palaces facing the following streets: Bianca di Savoia, S. Lucia, Piazzetta Mondadori, S.Martino.

  •   Creation of an underground parking with 2 private boxes for each living unit.

  •   Creation of an internal "Italian" garden.

All the living units will be delivered with a very high level finishing and will be provided with centralised cooling/heating system with independent metering. This will allow each owner to benefit from the advantages of the autonomous air-conditioning without relate disadvantages such as technical volumes, compressor noise, gas boiler dangers, maintenance costs.

The technological areas are placed in the 3rd basement thereby keeping the noises and electromagnetic pollution due to the transformation from HV to LV far from flat area. Provision is then made in every apartment for the installation, if desired by the owner, of home automation equipment.

Sanitary and heating hot water for the living units will be produced by three methane gas boilers. The cooling will be supplied by ACUs using the underground table water as chilling fluid, then coveyed in the Vettabbia culvert after the use.

The common parts power is produced by the transformation from HV (23kV) while absolute continuity systems assure the security lights on the stairways and in the parking.

The entire complex is covered by security systems such as:

  •   Fire detection system in the technical areas

  •   Gasoline vapours and carbon monoxide detection system in the parking

  •   Perimetral CCTV surveillance

The following systems have also been foresee:

  •   Centralised satellite TV system distributed by fibre-optic to the living units

  •   Automatic light switch-on in the parking

DESIGN DATA:
32.115 mq

WORKS AMOUNT:  2.706.000 € - Electrical and Special plants - 5.037.000 € - HVAC plants

PERIOD:                 From December 2004 to 2006 (design)